Meccon is an industrial construction company specializing in the installation of Airport Bulk Fuel, Fuel Transmissions Mains and Aircraft Hydrant Fuel Systems. We have extensive experience in the installation and modifications of new and existing systems for American Airlines, Delta Air Lines, JetBlue Airways, United Airlines, and Southwest Airlines. Airports where we have successfully completed projects include:
Due to our diverse experience, we are able to offer a creative approach to the construction management of our contracts resulting in providing our clients with the most safe and cost effective project within the schedule required to meet their needs. Meccon's advanced project management techniques include the use of "time-scaled network diagram" construction schedules.
Our project management team provides advanced planning of each phase of work and outlines in detail the actual items of work that our field forces are required to perform. This commitment to scheduling is important to the actual implementation of the work and is especially critical when performing work to minimize the impact on current operations.
Construction services we offer for new installations and the modifications to existing systems include:
Meccon's experience constructing airport facilities is extensive with the projects performed at major airports since 1982 exceeding a value of Four Hundred Million Dollars ($400,000,000.00).
constructed by Meccon include active fuel storage at Chicago's O'Hare International and Midway Airports, Reno-Tahoe International Airport, New York John F. Kennedy International Airport, Nashville International Airport, and San Bernardino International Airport. Total fuel capacity build exceeds 600,000 barrel storage (total capacity 25,000,000 gallons)
constructed by Meccon on operating airports facilities exceeds fifty-six (56) miles (300,000 lineal feet). Associated system elements include concrete isolation valve vaults, taxiway crossings, tunnel & culvert crossings, boring and jacking operations, horizontal directional drilling (HDD), fuel system flushing and line tie-ins to existing systems.
constructed by Meccon for new and existing airport concourse and terminal facilities for all major airlines. Project scope of work includes the installation of isolation valve vaults, hydrant fueling pits, emergency fuel shutoff systems (EFSO), hydrant system flushing and commissioning. Hydrant fuel systems constructed from 1982 – 2021 include the following facilities: